A zoning scheme evaluation method for 220kv urban ring network
A scheme evaluation and ring network technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as ignoring subordinate indicators and subjective or objective evaluation results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0040] A 220kV urban ring network partition scheme evaluation method, comprising the following steps:
[0041] Obtain the zoning scheme of 220kV urban ring network;
[0042] Extract the three-phase short-circuit current index and single-phase short-circuit current index at the 220kV bus that is directly related to the 500kV substation, the main transformer "N-1" power flow index of the 500kV substation, and the important line "N-1" power flow index; the important line "N-1" N-1" refers to the research of a certain area in the power grid due to excessive load, resulting in some lines with relatively heavy loads.
[0043] The internal subordinate indicators of the above four types of indicators are extracted and standardized to form a secondary indicator decision matrix R k =(r ij ) n×m ;
[0044] Using information entropy method to R k Int...