220kv urban ring network partitioning scheme assessment method
A solution evaluation, ring network technology, applied in the direction of instruments, data processing applications, calculations, etc., can solve the problems of subjective or objective evaluation results and neglect of subordinate indicators
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0040] A 220kV urban ring network partition scheme evaluation method, comprising the following steps:
[0041] Obtain the zoning scheme of 220kV urban ring network;
[0042] Extract the three-phase short-circuit current index and single-phase short-circuit current index at the 220kV bus that is directly related to the 500kV substation, the main transformer "N-1" power flow index of the 500kV substation, and the important line "N-1" power flow index; the important line "N-1" N-1" refers to the research of a certain area in the power grid due to excessive load, resulting in some lines with relatively heavy loads.
[0043] The internal subordinate indicators of the above four types of indicators are extracted and standardized to form a secondary indicator decision matrix R k =(r ij ) n×m ;
[0044] Using information entropy method to R k Int...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 