Two-stage Priority Structure Control Valve Block in Closed Center Load Feedback Hydraulic System
A load feedback and hydraulic system technology, applied in the field of tractors, can solve the problems of increasing pipeline connections, inconvenient design and installation layout, etc., and achieve the effect of reducing the number of parts, simplifying design and installation layout structure, and rigorous system structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0007] The present invention will be further described below in conjunction with the accompanying drawings. Such as figure 1 As shown, the two-stage priority structure control valve block in the closed-center load feedback hydraulic system mainly includes: priority valve body 1, load feedback check valve 2, secondary priority valve balance damping 3, secondary priority spool 4, Second priority valve reset damping 5, second priority valve reset spring 6, steering pressure limiting valve 7, first priority valve reset damping 8, first priority valve reset spring 9, first priority valve core 10, first priority valve balance Damping 11, first-level priority valve check valve 12; the integrated priority valve body 1 is equipped with a casting cavity and a connecting oil passage, and the oil is connected to the priority valve through the inlet A of the priority valve body 1, and the first-level priority The spool 10, and its components at the left and right ends are installed at the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
