Multi-Agent short-term optimization dispatching method for hydroelectric station group
A technology for optimizing scheduling and hydropower station groups, applied in the field of testing, can solve problems such as the inability to meet short-term optimal scheduling of large-scale hydropower station groups
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0061] The present invention will be further described below in conjunction with the embodiments and the accompanying drawings.
[0062] What the present invention is aimed at is to set the water model with electricity.
[0063] A short-term optimal scheduling method for hydropower station groups based on multi-agent task automatic assignment, comprising the following steps,
[0064] Step (1), establish a short-term optimal dispatching model for hydropower station groups
[0065] Objective function: E = min Σ t = 1 T Σ k = 1 K Q k , t ( P k , t , ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com