A construction method and technology of the main tower, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of high labor intensity, difficult to guarantee construction quality, long construction period, etc., to reduce labor intensity, shorten construction period, Guarantee the effect of construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0080] The sinking and floating construction method of the main tower of the bridge, method A includes the following steps:
[0081] 1) The base 4 and the main tower column 5-1 are manufactured in the workshop, and the main tower column 5-1 and the base 4 are transported to the set water area by floating, shipping, etc., as shown in figure 2 shown;
[0082] 2) if image 3 As shown, by injecting water into the bottom of the base 4 and the main tower column 5-1 or pumping water outwards, and / or adjusting the position of the base 4 and the main tower column 5-1 at the joints of the water surface by lifting equipment, the main The bottom of the tower column 5-1 is hinged with the base 4;
[0083] 3) if Figure 4 , Figure 5 As shown, the base 4 sinks by injecting water into the base 4, and the buoyancy makes the main tower column 5-1 rotate around the hinge center and gradually erect;
[0084] 4) if Figure 6-Figure 8 As shown, the main tower columns 5-1 are connected toget...
Embodiment 2
[0087] The sinking and floating construction method of the main tower of the bridge, method B includes the following steps:
[0088] 1) The base 4, the lower main tower column 5-1A and the upper main tower column 5-1B are manufactured in the workshop and transported to the set water area by means of floating or shipping;
[0089] 2) if Figure 9 As shown, by injecting water into the bottom of the base 4 and the lower main tower column 5-1A or pumping water outward, and / or adjusting the position of the base 4 and the lower main tower column 5-1A on the water surface at the joints of the water surface by lifting equipment, etc. Hinge the bottom of the lower main tower column 5-1A with the base 4;
[0090] 3) if Figure 10 As shown, by injecting water into the top of the lower main tower column 5-1A and the upper main tower column 5-1B or pumping water outwards, and / or adjusting the lower main tower column 5-1A and the upper main tower column 5 by lifting and other equipment -...
Embodiment 3
[0096] Such as Figure 16 As shown, the bridge main tower ups and downs construction method containing oblique arm 6 comprises the following steps:
[0097] 1) The base 4, the main tower column 5-1, the oblique arm 6, and the connecting rod 7 are manufactured in the factory, and are transported to the set water area by means of floating or shipping;
[0098] 2) if Figure 17 As shown, one end of the connecting rod 7 is hinged with the top of the oblique arm 6, and the bottom of the oblique arm 6 is hinged with the base 4;
[0099] 3) if Figure 18 As shown, the bottom of the main tower column 5-1 is hinged with the base 4;
[0100] 4) if Figure 19 As shown, the top of the main tower column 5-1 is hinged with the other end of the connecting rod 7;
[0101] 5) if Figure 20 , Figure 21 As shown, the top of the main tower column 5-1 is hinged to form the main tower 5, and then floats up.