A Settlement Control Method of Open-cut Tunnel with Heavy Covering Soil in Weak Stratum
A technology for open-cut tunneling and settlement control, applied in excavation, construction, artificial islands, etc., can solve problems such as tunnel settlement, and achieve the effect of reducing construction period, saving costs, and reducing settlement.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0057] Such as Figure 2~3 As shown, the tunnel construction structure of this embodiment is consistent with the prior art, including two rows of enclosure piles 2 on both sides of the tunnel 1, foundation piles 3 are inserted between the enclosure piles 2, and the foundation pit is excavated to pour the tunnel 1. 1 Backfill the backfill soil layer above. There is no direct connection between the retaining pile 2 and the tunnel 1, which is a composite structure. Such as image 3 As shown, the lower end of the foundation pile 3 goes deep into the bearing layer, and the foundation pile 3 is stabilized by fixing the bearing layer.
[0058] The open-cut tunnel 1 needs to be reinforced with foundation piles 3 to prevent settlement under the condition of soft ground and heavy soil covering. Since the compressive strength of the foundati...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com