Deep water steel casing matching device and method
A steel casing and deep-water steel technology, which is applied in construction, sheet pile walls, and foundation structure engineering, can solve problems such as high construction costs and large safety hazards, and achieve the effects of simple structure, saving production costs, and convenient installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] Such as figure 1 , 2 Among them, a deep-water steel casing matching device, the assembled submerged barge 2 has a multi-layer structure, and in a preferred solution, the assembled submerged barge 2 is fixed on the water surface of the construction area by a plurality of anchor cables 1 . There is at least a ballast area 21 in the lower layer, and at least one layer of empty warehouse area 22 is provided above the ballast area 21, and drainage and water inlet devices are provided in the ballast area 21; in a preferred solution, the drainage and water inlet The device includes a drainage pump, which realizes water intake and drainage through the switching of pipelines and valves. Or adopt the structure of drain pump and water inlet valve. In this example, the ballast area 21 is used to control the height of the entire assembled submerged barge 2 , while the empty compartment area 22 is used to provide the main buoyancy of the assembled submerged barge 2 .
[0035] Such...
Embodiment 2
[0041] Such as Figure 1~6 Among them, a method for fitting steel casings using the above-mentioned deep-water steel casing fitting device includes the following steps:
[0042] 1. Use the anchor cable 1 to fix the combined submerged barge 2 at the construction position of the steel casing, and set the bottom section steel casing 12 from the guide area; preferably, the bottom section steel casing 12 can be combined with the submerged The barge 2 is put in place at the construction site, and can also be transported in place by the transfer barge 3.
[0043] 2. Use the transfer barge 3 to transfer the top section heightening steel casing 9 to the assembled submerged barge 2;
[0044] The steel casing is processed on the shore. When transferring the steel casing, a slide rail is provided on the shore, and the translation base 5 is located on the slide rail, and the steel casing is vertically fixed on the translation base 5 by fixing the anchor rope 4;
[0045] The slide rail on...