Bias input time-fair scheduling method in single-carrier power line system
A scheduling method and power line technology, applied in the field of power line communication, can solve the problems of users not getting service, ignoring user fairness and other service quality problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] In each time slot, the basic flow of the time fair scheduling method based on single carrier power line is as follows:
[0028] step 1:
[0029] estimate It can be divided into uplink estimation and downlink estimation.
[0030] Uplink: The base station estimates the channel conditions for each user and then calculates the signal-to-noise ratio i=1,...,N.
[0031] Downlink: user i measures its own channel condition, and then estimates its own SNR Finally, the estimated value is sent to the base station.
[0032] Step 2:
[0033] Base station according to formula The scheduling strategy to determine which user should be called for the time slot to transmit.
[0034] Step 3:
[0035] Data transmission is performed according to the selected scheduling scheme.
[0036] Uplink: The base station broadcasts the ID number of the selected user, and selects the user to transmit in this time slot.
[0037] Downlink: The base station transmits messages to the schedule...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


