Preparation method of reinforced concrete jacking pipe
A technology of reinforced concrete and concrete, which is used in the direction of strengthening and forming
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0012] The present invention will be further described in conjunction with examples.
[0013] A preparation method for reinforced concrete pipe jacking, comprising the following steps:
[0014] (1), adopt the hanging roller method to make the base blank of pipe jacking in the pipe mold of pipe jacking;
[0015] (2) Feed the fine aggregate into the base base, and continue to use the suspension roller method, the suspension time is 1 to 3 minutes, and form a concrete fine aggregate layer on the inner wall of the base base, and the fine aggregate layer and the base base The thickness ratio is 20:100, and the fine aggregate in the fine aggregate layer includes 50 parts by weight of water, 100 parts by weight of cement, 80 parts by weight of medium sand, and 20 parts by weight of lime;
[0016] (3) The pipe mold is carried by the hosting machine and the pipe mold is rotated circumferentially. The linear speed of the pipe mold rotation is 10 m / min, and the PVC sheet is vibrated and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com