Building project coordination management method based on wechat

A collaborative management and project technology, applied in data processing applications, instruments, program control devices, etc., can solve problems such as difficulties in collaboration and blocked communication on construction projects, and achieve the effect of improving quality and safety issues and enhancing the realization of construction intentions.

Inactive Publication Date: 2017-02-22
西安易营信息科技有限公司
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the above problems, the present invention provides a WeChat-based construction project site collaborative management method. Based on the WeChat platform, combined with the principle of synergy, it provides a general solution for solving problems such as communication blockage and collaboration difficulties at the construction project site , which can easily realize that all systems involved in the construction work together around the project construction goals

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building project coordination management method based on wechat

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] In order to make the objects and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0014] Such as figure 1 As shown, the embodiment of the present invention provides a WeChat-based construction project site collaborative management method, including the following steps:

[0015] (1) After creating the project organization structure, call the WeChat API according to the participation of multiple parties to generate an internal collaboration platform and a cross-organization collaboration platform;

[0016] According to the organizational structure of the project, it includes the construction party, the supervisor, the construction party, and the construction agent. Taking the supervision party as an example, a cross-organizati...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a building project coordination management method based on wechat. The building project coordination management method comprises the following steps: establishing a project organizational structure, and meanwhile calling wechat APIs to generate an internal coordination platform and an inter-organization coordination platform; issuing an instruction dispatching task through key word matching in the internal coordination platform and the inter-organization coordination platform; after a project site task is completed, firstly judging whether information generated by the task is single-organization information or inter-organization information, if the information is the single-organization information, calling the wechat APIs to send the information to the internal coordination platform respectively; if the information is the inter-organization information, calling the wechat APIs to send the information to the inter-organization coordination platform respectively. Based on a wechat platform, a synergetic theory is combined, and a common resolution is provided for solving the problems such as building project site communication blockage and coordination difficulty, so that all systems participating building can easily work shoulder to shoulder around engineering construction together.

Description

technical field [0001] The invention relates to the field of collaborative communication on construction project sites, in particular to a method for collaborative management of construction project sites based on WeChat. Background technique [0002] Under the current project management system in my country (taking the construction stage as an example), the construction site is mainly operated by the three units of the owner, construction, and supervision, and the three goals of project quality, progress, and investment are guaranteed through project management methods under the constraints of laws and regulations. To achieve, to prevent security incidents. Due to the different interests of all parties, the process of engineering construction is often complicated and entangled due to the influencing factors, resulting in various problems, and the engineering construction has become the focus of attention of the society and the government. Therefore, how to timely feedback re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06F9/44
CPCG06Q10/103G06F8/20
Inventor 申长均董鹏田廷辉
Owner 西安易营信息科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products