Portable three-floating-body silt extracting system for small and medium-sized reservoirs
An extraction system and portable technology, applied in the field of sand mining equipment, can solve the problems of consuming water resources, unable to adapt to sand mining or dredging operations, affecting industrial and agricultural economic development, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] Example 1: see Figure 1-28 , A portable three-floating silt extraction system for small and medium-sized reservoirs, including basic platform, propulsion system, sand pumping unit, sand suction pipe suction head, sand flushing pump, sand suction pipe suction head lifting system, and sand suction head working conditions Balance system and power supply equipment.
[0062] The basic platform includes a main pontoon 1 and side pontoons 2 on both sides of the main pontoon 1. Both the main pontoon 1 and the side pontoons 2 are of fully electric welded steel structure. The main pontoon 1 and the side pontoons 2 are between It is connected by a detachable floating box connection hinge 6.
[0063] The propulsion system includes propellers 5 respectively installed at the tail of the side pontoon 2, and the installed power of the propellers 5 is 25HP×2.
[0064] The sand pumping unit includes two sand pumping pumps connected in series. The front end of the main pontoon 1 is provided wi...
Embodiment 2
[0081] Example 2: see Figure 29-31 The second embodiment is basically the same as the first embodiment, and the similarities will not be repeated. The difference is that it also includes a riverbed quality sampling system, which includes a vibrating heavy hammer deep water sampler 18, a sampling operation platform 17, and sampling The operating platform 17 is installed at the front end of the main pontoon 1, the sampling operating platform 17 is connected to the main pontoon 1 and the side pontoon 2, and the vibrating hammer type deep water sampler 18 includes a bracket 1805 connected to the sampling operating platform 17 , The upper end of the bracket 1805 is connected with two parallel guide rails 1803, a sampling tube 1804 is arranged between the two guide rails 1803, the lower end of the sampling tube 1804 is fixedly installed on the bracket 1805, and the upper end of the sampling tube 1804 slides through the slide block. Installed on two guide rails 1803, the upper end po...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


