Construction area distribution network planning method and system
A distribution network planning and power grid technology, applied in the direction of instruments, data processing applications, resources, etc., can solve the problems of insufficient investment in distribution network, low reliability level, high line loss rate, etc., and achieve the effect of maximizing investment benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0064] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0065] Take the transformation and construction of the distribution network in the planned development area of Yunnan Province as an example.
[0066] The distribution network in the built-up area is between the distribution network in the built-up area and the distribution network in the natural development area, and it can be used as a transitional stage for power distribution in the built-up area. In the case where the government has a clear plan, the grid planning method can be considered to plan the distribution network; Describe this method in detail.
[0067] 1. Bottom-up planning method of distribution network in construction area
[0068] In recent years, there have been a series of problems such as sudden increase in electricity load in tourist attractions, overloaded operation of distribution ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com