Concrete funnel for civil engineering
A civil engineering and concrete technology, which is applied in the field of concrete funnels for civil engineering, can solve the problems of narrow discharge opening, blockage, and affecting the normal use of the funnel, and achieve the effect of preventing accumulation blocking, avoiding solidification and accumulation, and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] A concrete funnel for civil engineering, comprising a bucket body 1, four outriggers 2 are connected to the lower part of the bucket body 1, and the adjacent outriggers 2 are reinforced by cross bars 3, and the outriggers 2 are provided with Vibration damping spring 4 is arranged, and motor 5 is arranged on the outer wall of described bucket body 1 top respectively, and the rotating shaft of described motor 5 is fixedly connected with threaded rod 6, and described threaded rod 6 matches with threaded seat 7, and described threaded seat 7. The vertical rod 8 is fixedly connected, and the wedge-shaped scraper 9 is connected to the bottom of the vertical rod 8. The wedge-shaped scraper 9 is provided with a T-shaped block 10, and the T-shaped block 10 is connected with the inner wall of the bucket body 1. The T-shaped groove 11 matches, and the outer wall of the bottom of the bucket body 1 is fixed with a pneumatic hammer 12 .
[0023] Further, the connection method between...
Embodiment 2
[0028] A concrete funnel for civil engineering, comprising a bucket body 1, four outriggers 2 are connected to the lower part of the bucket body 1, and the adjacent outriggers 2 are reinforced by cross bars 3, and the outriggers 2 are provided with Vibration damping spring 4 is arranged, and motor 5 is arranged on the outer wall of described bucket body 1 top respectively, and the rotating shaft of described motor 5 is fixedly connected with threaded rod 6, and described threaded rod 6 matches with threaded seat 7, and described threaded seat 7. The vertical rod 8 is fixedly connected, and the wedge-shaped scraper 9 is connected to the bottom of the vertical rod 8. The wedge-shaped scraper 9 is provided with a T-shaped block 10, and the T-shaped block 10 is connected with the inner wall of the bucket body 1. The T-shaped groove 11 matches, and the outer wall of the bottom of the bucket body 1 is fixed with a pneumatic hammer 12 .
[0029] Further, the connection method between...
Embodiment 3
[0035] A concrete funnel for civil engineering, comprising a bucket body 1, four outriggers 2 are connected to the lower part of the bucket body 1, and the adjacent outriggers 2 are reinforced by cross bars 3, and the outriggers 2 are provided with Vibration damping spring 4 is arranged, and motor 5 is arranged on the outer wall of described bucket body 1 top respectively, and the rotating shaft of described motor 5 is fixedly connected with threaded rod 6, and described threaded rod 6 matches with threaded seat 7, and described threaded seat 7. The vertical rod 8 is fixedly connected, and the wedge-shaped scraper 9 is connected to the bottom of the vertical rod 8. The wedge-shaped scraper 9 is provided with a T-shaped block 10, and the T-shaped block 10 is connected with the inner wall of the bucket body 1. The T-shaped groove 11 matches, and the outer wall of the bottom of the bucket body 1 is fixed with a pneumatic hammer 12 .
[0036] Further, the connection method between...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


