A Method of Scheduling and Allocation of Measurement and Control Resources Based on Multi-agent and DNN
A resource scheduling and resource allocation technology, applied in the field of agents, can solve problems such as increased difficulty in solving measurement and control problems, high measurement and control pressure, and increased conflicts in measurement and control requirements, achieving high strength, high difficulty, good modularity and scalability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Hereinafter, the present invention will be described in detail based on the drawings.
[0027] Below in conjunction with accompanying drawing, the mode of invention is described in further detail:
[0028] 1. The technical route adopted is as follows: figure 1 shown. Based on the scheduling method of multi-agent cooperation technology, the dynamic scheduling problem of measurement and control resources includes three types of agents. The specific content is as follows:
[0029] (1) Manager Agent. The core of measurement and control resource allocation and scheduling is responsible for the management of the entire measurement and control resource scheduling and allocation, including task allocation, management, scheduling, and measurement and control resource management.
[0030] (2) Task Agent. Contains a collection of all tasks to be assigned and scheduled, and the relationship with the actual tasks is corresponding and mapped. Under normal circumstances, the tas...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


