Habitat construction method for benthos in plain rivers
A technology of benthic animals and construction methods, applied in construction, sea area engineering, fish farming, etc., can solve the problems of habitat degradation and biodiversity reduction of benthic animals, and achieve the goal of increasing community diversity and improving habitat quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0107] Step 1, preliminarily select the plain river section near the first riparian zone with a water flow velocity less than 0.4m / s as the benthos habitat construction section, and the length of the benthos habitat construction section is 230m;
[0108] Step 2: Building a plurality of porous rockfill weirs and dams along the extension direction of the first river bank at the upstream of the benthos habitat construction section, wherein any one of the porous rockfill weirs starts from the first river bank The length of the belt extending to Hanoi is 2.0m, and the distance between two adjacent porous rockfill dams is 10m; a total of 8 porous rockfill dams are set; The waters of the first riparian zone are transplanted with cattails and / or calamus in a plurality of patches to form an aquatic plant community, wherein the extended length of the aquatic plant community on part of the first riparian zone is at least 40m, and transplanted The length of each formed patch along the ext...
Embodiment 2
[0119] Step 1, preliminarily select the river section of the plain river where the water flow velocity near the first riparian zone is less than 0.4m / s as the river section for the construction of the benthic habitat, and the length of the section for the construction of the benthic habitat is 200m;
[0120] Step 2: Building a plurality of porous rockfill weirs and dams along the extension direction of the first river bank at the upstream of the benthos habitat construction section, wherein any one of the porous rockfill weirs starts from the first river bank The length of the zone extending towards Hanoi is 2.5m, and the distance between two adjacent porous rockfill dams is 12m; a total of 6 porous rockfill dams are set;
[0121] Cattails and / or calamus are transplanted in multiple patches in the water area near the first riparian zone between two or two porous rockfill dams to form aquatic plant communities, wherein the aquatic plant communities are partly described in the fi...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com