A kind of steel bar bending equipment for building construction
A technology for steel bar bending and building construction, which is applied in the field of bending equipment and can solve the problems of slow bending speed, inability to bend steel bars, and high labor intensity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A steel bar bending equipment for building construction, such as Figure 1-4 As shown, it includes a vertical plate 1, a movable n-shaped frame 2, a hydraulic cylinder 3, a u-shaped rod 4, a limit plate 5, a fixed n-shaped frame 7, a first cylinder 8 and a first slider 10, and the front of the vertical plate 1 The limit plate 5 is installed on the left side of the middle part of the side, the hydraulic cylinder 3 is installed symmetrically on the left and right sides of the lower part of the front side of the vertical plate 1, and the U-shaped rod 4 is installed between the telescopic rods of the hydraulic cylinder 3 on the left and right sides. A fixed n-type frame 7 is installed on the left side of the upper part of the side, and a first cylinder 8 is installed horizontally on the left side of the fixed n-type frame 7. 2. Located on the right side of the fixed n-shaped frame 7, the upper and lower sides of the upper right side of the front side of the vertical plate 1...
Embodiment 2
[0023] A steel bar bending equipment for building construction, such as Figure 1-4 As shown, it includes a vertical plate 1, a movable n-shaped frame 2, a hydraulic cylinder 3, a u-shaped rod 4, a limit plate 5, a fixed n-shaped frame 7, a first cylinder 8 and a first slider 10, and the front of the vertical plate 1 The limit plate 5 is installed on the left side of the middle part of the side, the hydraulic cylinder 3 is installed symmetrically on the left and right sides of the lower part of the front side of the vertical plate 1, and the U-shaped rod 4 is installed between the telescopic rods of the hydraulic cylinder 3 on the left and right sides. A fixed n-type frame 7 is installed on the left side of the upper part of the side, and a first cylinder 8 is installed horizontally on the left side of the fixed n-type frame 7. 2. Located on the right side of the fixed n-shaped frame 7, the upper and lower sides of the upper right side of the front side of the vertical plate 1...
Embodiment 3
[0026] A steel bar bending equipment for building construction, such as Figure 1-4 As shown, it includes a vertical plate 1, a movable n-shaped frame 2, a hydraulic cylinder 3, a u-shaped rod 4, a limit plate 5, a fixed n-shaped frame 7, a first cylinder 8 and a first slider 10, and the front of the vertical plate 1 The limit plate 5 is installed on the left side of the middle part of the side, the hydraulic cylinder 3 is installed symmetrically on the left and right sides of the lower part of the front side of the vertical plate 1, and the U-shaped rod 4 is installed between the telescopic rods of the hydraulic cylinder 3 on the left and right sides. A fixed n-type frame 7 is installed on the left side of the upper part of the side, and a first cylinder 8 is installed horizontally on the left side of the fixed n-type frame 7. 2. Located on the right side of the fixed n-shaped frame 7, the upper and lower sides of the upper right side of the front side of the vertical plate 1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 