Park road structure and paving construction process thereof
A construction technique and technology of gardening roads, applied to roads, road surfaces, roads, etc., can solve problems such as damage and poor bearing capacity of garden roads
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] Such as figure 1 As shown, a garden road structure, including two side protection layers 2 arranged on both sides of the foundation pit 1 and close to the side wall of the foundation pit 1, the interior of the foundation pit 1 is from bottom to top between the two side protection layers 2 A bottom layer 3, a buffer layer 4, an inward layer 5, a receiving layer 6 and a top layer 7 are arranged in sequence. The side protection layer 2 is composed of more than two side protection plates 21 arranged in the longitudinal direction of the foundation pit 1, the board surface of each side protection plate 21 is close to the side wall of the foundation pit 1, and each side protection plate 21 is connected with the corresponding Adjacent side guards 21 are in close contact, and the upper ends of all side guards 21 protrude from the foundation pit 1 to form curbs 211 .
[0051] Such as figure 1 with figure 2 As shown, the bottom layer 3 includes more than two concrete pipes 31 ...
Embodiment 2
[0070] Such as figure 1 As shown, a garden road structure, including two side protection layers 2 arranged on both sides of the foundation pit 1 and close to the side wall of the foundation pit 1, the interior of the foundation pit 1 is from bottom to top between the two side protection layers 2 A bottom layer 3, a buffer layer 4, an inward layer 5, a receiving layer 6 and a top layer 7 are arranged in sequence. The side protection layer 2 is composed of more than two side protection plates 21 arranged in the longitudinal direction of the foundation pit 1, the board surface of each side protection plate 21 is close to the side wall of the foundation pit 1, and each side protection plate 21 is connected with the corresponding Adjacent side guards 21 are in close contact, and the upper ends of all side guards 21 protrude from the foundation pit 1 to form curbs 211 .
[0071] Such as figure 1 with figure 2 As shown, the bottom layer 3 includes more than two concrete pipes 31 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

