Road wearing layer construction technology
A construction technology, wear layer technology, applied in the field of road and bridge engineering construction, can solve the problems that the asphalt road construction technology cannot meet the requirements of anti-skid, wear resistance and noise reduction of urban road construction, achieve good promotion and application prospects, and increase viscosity , the effect of reducing traffic impact
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0029] The preparation technical scheme of described a kind of modified asphalt is:
[0030] 13Kg of SBS particles, 12Kg of rubber powder, 76Kg of asphalt, 0.5Kg of methyl silanol / silicate crosslinked polymer, 0.07Kg of 1,1`-bis(dimethylsilyl) iron, 0.09 The molybdenum acetylacetonate of Kg is heated to 160°C, keeps the temperature constant and stirs for 55min, adds 0.9 Kg of nano-hydrotalcite and 5Kg of ethylene glycol, 0.6Kg of 1-decanethiol, and then carries out the asphalt mixture Stirring and shearing result in a modified asphalt.
[0031] The sample number is DV-1.
Embodiment 2
[0033] A road wear layer construction technology, the technical scheme is as follows:
[0034] Step A, the preparation of asphalt mixture, the asphalt mixture consists of 60kg of modified asphalt, 100kg of coarse aggregate, 90kg of fine aggregate, 50kg of slag powder, 2kg of polyester fiber and 0.5kg of alkaline limestone slag powder Heat to 170°C, stir for 5 minutes, and then leave the market at 175°C;
[0035] Step B, pre-pavement treatment, thoroughly deal with the existing quality defects of the pavement before construction, eliminate quality hazards, remove potholes, block cracks and wrapping and other diseases and restore them with hot-mix asphalt mixture, clean and fill the pavement cracks , use high-pressure fans to clean the road surface and keep the road surface clean and dry;
[0036] Step C, Sprinkle modified asphalt, spread the modified asphalt on the surface of the construction section, control the temperature of the modified asphalt to spray at 120°C, and the p...
Embodiment 3
[0044] A road wear layer construction technology, the technical scheme is as follows:
[0045] Step A, the preparation of asphalt mixture, the asphalt mixture is heated by the modified asphalt of 80kg, the coarse aggregate of 120kg, the fine aggregate of 110kg, the slag powder of 60kg, the polyester fiber of 5kg and the alkaline limestone mineral powder of 1kg to 190°C, stir for 10 minutes, and then leave the market at 185°C;
[0046]Step B, pre-pavement treatment, thoroughly deal with the existing quality defects of the pavement before construction, eliminate quality hazards, remove potholes, block cracks and wrapping and other diseases and restore them with hot-mix asphalt mixture, clean and fill the pavement cracks , use high-pressure fans to clean the road surface and keep the road surface clean and dry;
[0047] Step C. Sprinkle modified asphalt, spray the modified asphalt on the surface of the construction section, control the temperature of the modified asphalt to spra...
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
particle diameter | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com