Method and apparatus for producing and scheduling PC component

A component and production line technology, applied in the field of PC component production scheduling methods and devices, can solve problems such as unreliable guessing, failure to complete orders on schedule, and affect production and operation, and achieve the effect of objective judgment results

Active Publication Date: 2019-01-01
CHINA CONSTR THIRD BUREAU GREEN IND INVESTMENT CO LTD +1
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, traditionally, builders can only estimate the possibility of completing the order on schedule based on past experience. However, due to changes in production conditions and environments, past experience may not be applicable to the current situation. Therefore, such guesses are often unreliable, and sometimes builders Accepting an order that exceeds the scope of its own production capacity, and finally failing to complete the order on schedule, resulting in breach of contract losses. Sometimes the builder rejects an order within the scope of its own production capacity, which will also cause economic losses
It can be seen that builders lack an effective evaluation method for development project orders to decide whether to accept orders, which will affect their production and operation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and apparatus for producing and scheduling PC component

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] The present invention is a PC component production scheduling method, which is used to carry out PC component production scheduling according to the information of the development project on the order, and the information of the development project includes the serial number and construction period of the development project, such as figure 1 shown, including the following steps:

[0038] Calculate the shortest completion time corresponding to each development item in the order;

[0039] Compare the shortest completion time corresponding to each development project with the construction period required by the order, so as to judge whether the order can be completed on schedule;

[0040] If the order can be completed as scheduled, the message of accepting the order will be returned; otherwise, the message of rejecting the order will be returned.

[0041] In the method of the present invention, the shortest completion time of each development project, which is the compon...

Embodiment 2

[0091] The present invention also provides a PC component production scheduling device, including:

[0092] memory for storing at least one program;

[0093] The processor is configured to load the at least one program to execute the PC component production scheduling method described in Embodiment 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a PC component production scheduling method and a device. The method comprises the steps of calculating the shortest completion time corresponding to each development item in the order, comparing the shortest completion time corresponding to each development item with the construction time required by the order, thereby judging whether the order can be completed on time, ifthe order can be completed on time, returning the information of accepting the order, otherwise returning the information of rejecting the order, and the like. Through the method of the present invention, the construction period required by the order is the information of the order itself, the minimum completion time for each development item in the order is calculated by the builder according tothe current conditions of the developer, the shortest time to complete the actual construction of each development project, therefore, the builder need not refer to past experience, only according tothe information of the order itself, combined with the current conditions, can be judged, the judgement result is more objective. The invention is widely applied to the technical field of building industrialization.

Description

technical field [0001] The invention relates to the technical field of building industrialization, in particular to a production and scheduling method and device for PC components. Background technique [0002] In the field of construction, especially in the field of development of commercial buildings, builders often accept commissions through the order mode and carry out construction according to the requirements of the order. In the case of large-scale development, the contents of the order often include multiple development projects, and each development project includes multiple buildings, and the buildings are subdivided into floors. In order to improve production efficiency, PC components are usually applied in large quantities in the construction of each floor. PC components, also known as precast concrete (Precast Concrete), refer to concrete products processed and produced in factories through standardized and mechanized methods. They generally have standard speci...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06313G06Q10/103G06Q50/08
Inventor 杨玮潘寒黄熙萍卢仲兴高全叶万方雷光波邹贻权彭焱
Owner CHINA CONSTR THIRD BUREAU GREEN IND INVESTMENT CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More