A Construction Method for Preventing Uneven Settlement of New and Old Track Joints of Coke Quenching Cars
A technology for track joints and coke quenching cars, which is applied in the construction field of preventing uneven settlement of the new and old track joints of coke quenching cars, and can solve the problems that the coke quenching cars cannot be produced normally, the new and old track joints of coke quenching cars are unevenly settled, and cannot meet the requirements of water quenching. Focus on the normal use requirements and other issues, to achieve the effect of reducing engineering costs, convenient construction, and ensuring normal production
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The construction method of the present invention for preventing uneven subsidence of the old and new track joints of the quenching car is to provide a quenching tower water ditch that crosses the old track under the old track end of the quenching car, and to expand the new quenching car at the end of the old track. The track, forming the new and old track joint of the quenching car, includes the following steps:
[0031] a. Set up the new and old track joint reinforcement structure of the coke quenching car. see now figure 1 , figure 1 It is a schematic diagram of the plane layout of the coke oven device at the old and new tracks of the coke quenching car according to the embodiment of the present invention. The new and old track joints of the coke quenching car strengthen the structural layout, so that the foundation of the old track 2 ends on one side of the coke quenching tower ditch is connected, and the other side of the coke quenching tower ditch is provided wit...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


