Method for filling piles in place during house construction
A cast-in-place pile and on-site technology, applied in construction, sheet pile walls, foundation structure engineering, etc., can solve the problems of poor building stability, poor quality, and low construction efficiency of cast-in-place piles, and achieve high construction efficiency and quality assurance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0012] In the method of on-site pouring piles in house construction, the pile drivers for driving on-site piles can include diesel pile drivers and electric walking pile drivers. Close the flaps, press the pile tip into the soil with the vibrator and the self-weight of the pile tube, start the vibrator to vibrate the sinking tube, and place the steel cage after the pile tube reaches the design elevation position, and pour concrete into the pile tube with the upper hopper. The concrete is filled or slightly higher than the ground. When starting to pull out the pipe, first start the vibrator to vibrate for a while and then pull out the pipe, and use the hanging hammer to control and measure to confirm that the valve at the pile tip has opened and the concrete has flowed out of the steel pipe before pumping out. When pulling out the pile pipe, vibrate while pulling out the pipe, stop pulling every 0.5-1.0m, and vibrate for 5-10s until all the pipes are pulled out. The height shou...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More