[0041] Embodiment 1: A kind of pipe laying device for soft ground, such as figure 1 As shown, a plurality of prefabricated square trenches 1 are included, and the prefabricated square trenches 1 include a frame body 11 in a square frame and lifting lugs 12 integrally connected above the frame body 11 . The frame body 11 and the lifting lug 12 are made of reinforced concrete. In order to make the prefabricated square ditch 1 denser, the prefabricated square ditch 1 is made by mandrel vibration method.
[0042] combine figure 2 , the middle part of the frame body 11 is a hollow square placement cavity 111 . Four reinforcing ribs 13 are integrated inside the frame body 11 . The cross-section of the reinforcing rib 13 is triangular and strip-shaped. The four reinforcing ribs 13 are respectively placed on the four corners of the cavity 111 . One end of the opening of the frame body 11 is provided with a mounting groove 21 , and the other end is integrally provided with a moun...
Embodiment 2
[0054] Embodiment 2: a kind of construction method, such as figure 1 shown, including the following steps:
[0055] Step 1: Dig a strip-shaped trench on one side of the road, and set the length direction of the trench parallel to the length direction of the foundation;
[0056] Step 2: Use mountain gravel to evenly fill the bottom of the trench with a thickness of 1 meter;
[0057] Step 3: Lay the backing board on the gravel in the mountain field;
[0058] Step 4: Place a plurality of prefabricated square trenches 1 stably on the backing plate by hoisting by a crane;
[0059] Step 5: Stretch two adjacent prefabricated square trenches 1 to realize the connection of two adjacent prefabricated square trenches 1;
[0060] Step 6: plugging the connection joint between two adjacent prefabricated square trenches 1 with concrete;
[0061] Step 7: use concrete to fill the gap between the prefabricated square ditch 1 and the backing plate;
[0062] Step 8: Backfill compaction.