Method and device for monitoring electric power equipment

A technology for power equipment and preset thresholds, which is used in instruments, data processing applications, calculations, etc., can solve problems such as inability to predict the operating status of equipment, and achieve accurate monitoring results.

Pending Publication Date: 2019-03-15
云南电网有限责任公司保山供电局 +1
View PDF6 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing machine monitoring can only monitor the real-time data generated by the power equipment in the substation, such as point meter data and meter data of the equipment, without considering the impact of other external factors on the operation status of the equipment, and cannot Predict the operating status of the equipment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and device for monitoring electric power equipment
  • Method and device for monitoring electric power equipment
  • Method and device for monitoring electric power equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0054] In order to make the purpose, technical solution and advantages of the present application clearer, the technical solution of the present application will be clearly and completely described below in conjunction with specific embodiments of the present application and corresponding drawings. Apparently, the described embodiments are only some of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application.

[0055] The technical solutions provided by various embodiments of the present application will be described in detail below in conjunction with the accompanying drawings.

[0056] figure 1 It is a schematic flowchart of a monitoring method for electric equipment according to an embodiment of the present invention. Such as figure 1 As shown, the met...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a monitoring method and a device for electric power equipment. The method comprises the following steps: monitoring the relevant operation data of the electric power equipment;judging whether each data in the relevant operation data exceeds a preset threshold value; If each data in the related operation data does not exceed a preset threshold value, the current normal operation probability of the electric power equipment is determined according to the related operation data, and whether the operation state of the electric power equipment is abnormal is determined according to the current normal operation probability of the electric power equipment. The technical scheme can not only monitor the operation state data of the electric power equipment, but also comprehensively consider the influence of the environmental data and/or the point table data on the operation state of the electric power equipment when monitoring the operation state of the electric power equipment, so as to make the monitoring result of the operation state of the electric power equipment more accurate.

Description

technical field [0001] The present application relates to the technical field of equipment monitoring, in particular to a method and device for monitoring electric equipment. Background technique [0002] The power equipment of the substation is in operation for a long time. In order to ensure the safe and stable operation of the power equipment of the substation, discover the defects or hidden dangers of the equipment in time, and accumulate the original data of the condition maintenance, the on-site operators are often required to inspect the equipment regularly or irregularly. However, there are often many problems in the manual inspection of equipment, such as the influence of environmental factors, personnel quality, etc., which may easily lead to insufficient inspection and inspection, resulting in inspection efficiency and quality not reaching the expected effect , and consume a lot of manpower and material resources. [0003] In the prior art, with the implementatio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/00G06Q50/06
CPCG06Q10/20G06Q50/06
Inventor 董玉山姜洪东何云龙陈海琪刘畅张晓彬余涛邓勇池震杰朱红杰苏现金彭文英赵江梅
Owner 云南电网有限责任公司保山供电局
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products