Method for decomposing medium-term electricity trading plan for cascade hydropower stations
A cascade hydropower station group and power station technology, applied in the direction of calculation, instrumentation, data processing applications, etc., can solve the problems of centralized production, power overcapacity, large-scale advanced development of power supply, etc., to improve the level of fine scheduling and solve the problem of insufficient connection Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The present invention will be further described below in conjunction with the accompanying drawings and examples of implementation.
[0022] On the premise that the monthly transaction power of the power station has been determined, in order to consider fairness and ensure that the completion progress of the monthly cumulative power generation of each power station is consistent, the goal of decomposing and checking the power trading plan of large-scale hydropower station groups is to complete the monthly cumulative power generation of the day The maximum deviation between the degree and the completion degree of the system plan is the smallest, and the specific implementation method is as follows:
[0023] (1) Objective function
[0024]
[0025] In the formula, F m Indicates the maximum deviation between the monthly actual power generation completion degree and the system planned completion degree of all power stations on that day; t today and D represent the date...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 