Electric power pipeline corridor entering cost allocation method considering multivariate subject benefit balance

A cost sharing and power pipeline technology, applied in the field of power systems, can solve problems such as poor rationality of the method, lack of multi-dimensional consideration of interests among multiple subjects, and single consideration angle, and achieve a highly practical effect

Inactive Publication Date: 2019-07-16
STATE GRID ZHEJIANG ELECTRIC POWER +1
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Although the proportional apportionment method is simple to calculate and easy to understand; but it has a single perspective and the rationality of the method is poor
The principal-agent theory and game theory consider the relationship between the relevant subjects of the pipe gallery, which is more reasonable than the proportional allocation method; but it requires more assumptions and the calculation is complicated
In addition, the existing method of apportioning the cost of power pipelines entering the corridor lacks multi-dimensional consideration of the interests of multiple subjects entering the corridor, and needs to be improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Electric power pipeline corridor entering cost allocation method considering multivariate subject benefit balance
  • Electric power pipeline corridor entering cost allocation method considering multivariate subject benefit balance
  • Electric power pipeline corridor entering cost allocation method considering multivariate subject benefit balance

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] The present invention proposes a method for apportioning the cost of power pipeline entry corridors considering the balance of interests of multiple subjects, such as figure 1 Shown, including the following detailed steps:

[0038] Step 1. Determine the basis for apportionment of the cost of the power pipeline entry corridor, and estimate the engineering cost of the construction cost of the comprehensive utility corridor;

[0039] Before apportioning the cost of the power pipeline entry corridor, the cost composition of the comprehensive utility corridor should be analyzed first, that is, the cost to be apportioned should be clarified. The cost of the comprehensive pipe gallery is mainly divided into engineering construction costs and operation and maintenance costs. Considering the quasi-public property of the comprehensive utility corridor, the paid usage fee for the power pipeline entering the corridor is mainly divided into the corridor entry fee and the daily main...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The embodiment of the invention provides an electric power pipeline corridor entering cost allocation method considering multivariate main body benefit balance, and the method comprises the steps: determining an electric power pipeline corridor entering cost allocation basis, and carrying out the engineering cost estimation of the comprehensive pipe corridor construction cost; based on the proportion apportionment factor, apportioning the electric power pipeline corridor entering cost; and adopting a multi-element main body benefit balanced deviation minimization algorithm to share the electric power pipeline corridor entering cost, and obtaining a final cost sharing result of each pipeline unit of the corridor which comprises the electric power pipeline. By comprehensively considering theoccupied space proportion, the direct burial cost proportion and the operation benefit proportion of the pipelines, gallery entering fee sharing of the pipelines entering the comprehensive pipe gallery is carried out. The characteristics, the gallery entering characteristics and the cost bearing capacity of a pipeline unit can be well considered, different benefit appeals among relevant bodies ofthe pipe gallery are comprehensively considered, and the practicability is high.

Description

technical field [0001] The invention relates to the field of power systems, in particular to a method for apportioning the cost of entering corridors of power pipelines considering the balance of interests of multiple subjects. Background technique [0002] The urban underground comprehensive pipe gallery, also known as the common trench, refers to the public tunnels where municipal pipelines such as power, communication, water supply, and gas are laid underground in the city, and there are passageways for maintenance personnel. In 2016, the government issued the "Opinions on Promoting the Incorporation of Power Pipelines into Urban Underground Comprehensive Pipe Gallery", encouraging power pipelines to enter the comprehensive pipe gallery (referred to as "entry corridor"). However, as an emerging quasi-public welfare project, the comprehensive utility corridor is still in the exploratory stage, and all parties have not yet established a comprehensive understanding of their ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06G06Q50/26
CPCG06Q50/06G06Q50/26
Inventor 姚艳裴传逊任娇蓉许家玉方建迪高强崔勤越翁秉宇江昊
Owner STATE GRID ZHEJIANG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products