Project transaction closed-loop analysis method
An analysis method and project technology, applied in the field of closed-loop analysis of project changes, can solve problems such as non-compliance in execution, increased operational risks, and project schedule delays
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0006] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail with reference to the accompanying drawings. This description presents, by way of illustration and not limitation, specific embodiments consistent with the principles of the invention in sufficient detail to enable those skilled in the art to practice the invention without departing from this disclosure. Other embodiments may be utilized and the structure of elements may be changed and / or substituted within the scope and spirit of the invention. Accordingly, the following detailed description should not be read in a limiting sense.
[0007] The present invention provides a method for closed-loop analysis of project abnormalities, including:
[0008] Step S100 , based on the project milestone time, monitor the compliance status of the project from two dimensions of unit and time, and obtain thematic monitoring results...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com