Control method and device for building fire extinguishment and control system
A control method and building technology, applied in measuring devices, sensing radiation from gas/flame, fire rescue, etc., can solve problems such as inability to extinguish fire, poor fire extinguishing effect, property loss, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] see figure 1 As shown, a kind of control method for building fire extinguishing is provided in this embodiment, comprising the following steps:
[0059] S01: Receive environmental data and three-dimensional location data and / or serial number data monitored by the environmental data monitoring unit, wherein the environmental data monitoring unit includes environmental data monitoring components installed in multiple areas of the building.
[0060] Specifically, in this embodiment, the building may be a residential building, a public building, or an industrial building or an agricultural building, but the present invention is not limited thereto. A plurality of environmental data monitoring components are distributed on the outside and / or inside of the building, and are used to monitor whether there is a fire in the building. The environmental data monitoring component is one or more of smoke detectors, temperature detectors, flame detectors, special gas detectors, elect...
Embodiment 2
[0093] Referring to Embodiment 1, a rail pump vehicle is provided in this embodiment, which is applicable to the method described in Embodiment 1. The rail pump truck 09 includes a pump truck main body, such as figure 2 , image 3 As shown, the pump truck main body is provided with a first chute 301, one side of the pump truck main body is provided with a sling connector 110, and the pump truck main body is provided with a first partition, wherein the first partition connects the pump truck main body. The space is divided into the first cavity 10 and the second cavity 30; a first connection tube 60 is installed on the first partition, and the first connection tube 60 communicates with the first cavity 10 and the second cavity 30; The first tube body 702 is fixed on the side plate of the first cavity 10 , the first tube body 702 communicates with a telescopic tube 130 through a first rotating member 70 , and the telescopic tube 130 communicates with the spray head 140 through...
Embodiment 3
[0104] Referring to Embodiment 1, in this embodiment, a specific structure of a dry refrigerator is provided. The first fixed plate 10b is provided with a plurality of first through holes, and the shrinkage of the dry ice bottle body 3 is disposed in the first through hole; the motor 2 and the booster pump 10d are all connected to an external power supply, and one or more dry ice bottle bodies 3 are installed. Located in the box body 1, the dry ice bottle body 3 includes a knob 30a for opening or closing the output port, the driving wheel 4 clamps the knob 30a, and drives the knob 30a to rotate under the drive of the worm 40a; At least two gas-collecting sub-pipes 50a, and a plurality of gas-collecting sub-pipes 50a are respectively connected to the output port of the dry ice bottle body 3. After the dry ice bottle body 3 is opened, the gas collecting pipe 5 enters the booster pump 10d, and then passes through the booster pump. 10d discharge after pressurization.
[0105] By ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com