Construction method for monitoring rotary injection process in real time
A construction method and real-time monitoring technology, applied in basic structure engineering, basic structure testing, construction, etc., can solve the problems of difficult to take remedial methods, unable to make up for material waste, unable to dynamically monitor the diameter of piles, etc., to avoid accuracy oversized effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Such as figure 1 As shown, when the construction is carried out on the site where the standard penetration number N is 30, the following technical scheme is adopted.
[0032] A construction method for real-time monitoring of the rotary grouting process, characterized in that, based on a non-magnetic rotary grouting drill pipe with a pile diameter classification monitoring sensor and a multi-stage rotary grouting injection port combined with a rotary grouting drilling rig, the following steps are used to carry out rotary grouting Methods to realize dynamic construction, dynamic monitoring and dynamic feedback in the work industry:
[0033] Step 1: Prepare the construction site for rotary grouting and complete the pre-drilling operation;
[0034] According to the rotary grouting design plan, the drilling operation shall be carried out at the central axis of the rotary grouting pile body, and the construction site shall be cleaned up. Except for construction machinery and...
Embodiment 2
[0050] Such as figure 1 As shown, when the standard penetration number N is 70, the following technical scheme is adopted for construction.
[0051] A construction method for real-time monitoring of the rotary grouting process, characterized in that, based on a non-magnetic rotary grouting drill pipe with a pile diameter classification monitoring sensor and a multi-stage rotary grouting injection port combined with a rotary grouting drilling rig, the following steps are used to carry out rotary grouting Methods to realize dynamic construction, dynamic monitoring and dynamic feedback in the work industry:
[0052] Step 1: Prepare the construction site for rotary grouting and complete the pre-drilling operation;
[0053] According to the rotary grouting design plan, the drilling operation shall be carried out at the central axis of the rotary grouting pile body, and the construction site shall be cleaned up. Except for construction machinery and construction lines, no metal obj...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com