Construction method for dismounting space special-shaped large-tonnage steel beam bracket
A construction method and large-tonnage technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of high construction risk, small working space, and many high-altitude construction, so as to reduce construction costs and improve recycling and reuse. , the effect of ensuring safety and reliability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0024] A construction method for removing spatially heterogeneous large-tonnage steel beam brackets, combining figure 1 , figure 2 , including the following steps:
[0025] 1) The bracket 2 next to the pier is split into upper and lower layers, which are bracket 21 and bracket 22 respectively. The bracket 21 is a square frame structure com...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


