Unlock instant, AI-driven research and patent intelligence for your innovation.

Box girder removal method

A box girder and removal technology, applied in bridges, bridge construction, bridge maintenance, etc., can solve problems such as hidden safety hazards, large weight of cutting blocks, and impact on the stability of brackets.

Inactive Publication Date: 2021-10-15
THE GUANGDONG NO 3 WATER CONSERVANCY & HYDRO ELECTRIC ENG BOARD CO LTD
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0007] The purpose of the present invention is to provide a method for dismantling a box girder, to solve the problem that the existing method for dismantling a bridge is only applicable to the dismantling of a bridge with a smaller beam size and better integrity of the box girder. After cutting, the weight of the cutting block is large, and the impact load on the lower bracket is relatively large, which affects the stability of the bracket and has technical problems of great potential safety hazards

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Box girder removal method
  • Box girder removal method
  • Box girder removal method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0057] The technical solutions of the present invention will be described below in conjunction with examples, as will be described, as described in Examples of the present invention, not all of the embodiments of the invention. Based on the embodiments of the present invention, there are all other embodiments obtained without making creative labor without making creative labor premises.

[0058] like Figure 1 - Figure 14 As shown, the removal method of the box beam provided by the present invention includes the following steps:

[0059] Cut the horizontal direction of the box beam, cutting the box beam into a tank body 200 and a top plate 100; removing the top plate 100; cutting the groove body 200 into a plurality of sub-grooves 201 along the vertical cutting.

[0060] In the actual operation, first cut in the horizontal direction of the box girder, cutting the box beam into the top plate 100 and the tank body 200, then remove the top plate 100, then cut vertical cutting, the slo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for dismantling a box girder, which relates to the technical field of bridge construction and transformation. The method for dismantling a box girder provided by the invention includes the following steps: cutting along the horizontal direction of the box girder, and cutting the box girder into grooves body and top plate; remove the top plate; cut vertically, cut the trough body into multiple sub-trough bodies, in actual operation, first cut along the horizontal direction of the box girder, and cut the box girder into the top plate and the tank body, and then remove the top plate, and then cut the tank body into a plurality of sub-trough bodies, because the top plate is cut and removed first, so that the weight of the entire box girder is reduced, and the When the trough is cut, the impact load of the sub-trough on the bottom support assembly of the box girder is reduced, the safety of dismantling the box girder is improved, and the dismantling of a box girder with a larger cross beam size can be satisfied.

Description

Technical field [0001] The present invention relates to the field of bridge construction and renovation techniques, in particular, to a removal method of a box beam. Background technique [0002] During the high-speed development of urbanization, due to road renovation, the bridge self-structure aging and the need for the need to meet the development of supporting transportation, there will be more and more urban bridges face demolition reconstruction. [0003] For the bridge of the cash box beam, the following method is generally removed: [0004] It is usually necessary to consolidate the box girder and the pier column, that is, the concrete structure is poured at the top of the pier column, and the box beam is solidified by the bottom bridge pier, the pier and the concrete structure, and then the interior extension direction of the bridge plane is cut into whole block. Then the hoisting is removed. [0005] The method of removing the bridge above has the following problems: ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D24/00
CPCE01D22/00
Inventor 莫华马鹏超谢辉勇兰泽全袁凯朱加军陈鑫马俊华杨文耀黄煜彬
Owner THE GUANGDONG NO 3 WATER CONSERVANCY & HYDRO ELECTRIC ENG BOARD CO LTD