A kind of bridge and its construction method
A bridge, integrated technology, applied in the direction of bridges, bridge construction, bridge parts, etc., can solve problems such as broken, poor connection strength, separation of reinforcement plates, etc., to achieve the effect of enhancing stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Such as figure 1 As shown, a bridge includes a span board 1 , a connecting groove 11 is opened on both sides of the bridge board 1 , and a connecting piece 2 is arranged in the connecting groove 11 .
[0030] Such as figure 1 with figure 2 As shown, the connecting piece 2 includes a fixed part embedded in the bridge plate 1 at one end and a connecting part extending into the connecting groove 11, wherein the connecting part includes two first C-shaped plates 21 and a second C-shaped plate 21 arranged symmetrically. Plate 22, the opening directions of the two first C-shaped plates 21 are opposite, the opening directions of the two second C-shaped plates 22 are opposite, the first C-shaped plate 21 and the second C-shaped plate 22 share a vertical plate 23, and the two second C-shaped plates 22 share a vertical plate 23, and An end of a C-shaped plate 21 away from the vertical plate 23 is extended and connected to form a connecting plate 24 .
[0031] The fixed part i...
Embodiment 2
[0036] combine image 3 , a kind of bridge construction method, the bridge in application construction embodiment one, comprises the following steps:
[0037] S1. Make the connecting piece 2, the connecting piece 2 is integrally formed, and the first C-shaped plate 21 is directly processed during preparation, and the end of the second C-shaped plate 22 away from the first C-shaped plate 21 has not yet been bent and formed ;
[0038] S2. Preparation of the bridge slab 1. During the preparation process of the bridge slab 1, the connector 2 is pre-embedded in the bridge slab 1, and after the bridge slab 1 is formed, the second C-shaped plate 22 is separated by a bending machine. One end of the first C-shaped plate 21 is bent against the side wall of the connecting groove 11;
[0039] S3, the gasket 12 is set, and the gasket 12 is pasted on the side wall of the bridge plate 1;
[0040] S4, hoisting splicing, use the hoisting equipment to hoist the bridge plate 1 as a whole and ...