A threading structure for urban electric power engineering construction
A power engineering and urban technology, applied in cable installation, cable laying equipment, electrical components, etc., can solve the problems of inconvenient installation and fixation of reels, inconvenient steering, inability to judge the progress of construction time, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The technical solutions in the embodiments of the present invention will be apparent from the drawings in the embodiment of the present invention.
[0035] like Figure 1-7 , The present invention provides a technical solution: threading structure of a city with electric power engineering construction, comprising a base 1, above the base 1 is rotatably connected to the support frame 301, the inner support frame 301 is fixedly connected to the winding disc 4, the receiving reel 4 is mounted inside the steel wires 5, 5 of the steel wire by pulling one end of the spring 8 and the head 7 fixedly connected to the guide head 9, the receiving side of the reel 4 by the locking wheel 11 connected to the measuring device 6 activities.
[0036]The symmetric surface of the base 1 defines a threaded hole 101, the side walls of the base 1 defines a counterweight groove 102, the lower surface of the adhesive base has a rubber pad 2, by a threaded locking hole 101 is fixed to the chassis 1,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com