Angle steel tower auxiliary hoisting device and using method thereof
A technology for lifting devices and angle steel towers, which is applied to cranes and other directions, and can solve problems such as inability to complete equipment lifting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] like Figure 1 to Figure 3 As shown, the angle steel tower has angle steel, and the angle steel tower auxiliary lifting device is used to install the lifting pulley, including a fixing device, a connecting device and a supporting device. The fixing device is detachably fixed on the angle steel 4 of the angle steel tower, and the lower part of the supporting device can be moved It is rotatably arranged on the fixing device, and the upper part extends out from the angle steel tower, and the lifting pulley is installed on the upper end of the supporting device.
[0032] The fixing device includes a horizontal plate 11 and a vertical plate 12 vertically arranged to form a storage space with a right angle, a cover plate 13 that can be opened and closed on the storage space, and is arranged inside the cover plate 13 and can move closer to or away from the cover plate 13 The pressing block 14, the first bolt 15 passing through the cover plate 13 and the pressing block 14 to mo...
Embodiment 2
[0042]The difference between this embodiment and Embodiment 1 is that the suspender 32 is movably provided with a second suspension ring sleeve 35, and when the second suspension ring sleeve 35 needs to be moved, the locking screw on the second suspension ring sleeve 35 Dismount, can move, and the second suspension ring cover 35 is provided with the second suspension ring 36 (when in use, the second suspension ring 36 is the same as the first suspension ring 34, towards the bottom of the suspension rod 32), the second suspension ring cover 35 is positioned between the support bar 33 and the bottom of the suspension rod 32. The outside of the connection point of the boom 32. A screw hole is provided on the second ring cover 35 , and after the second ring cover 35 is moved to a proper position, the locking screw 25 penetrates into the screw hole to lock the second ring cover 35 . The purpose of setting the second lifting ring 36 is to be able to lift a variety of different objec...