Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Construction method for earth pressure balance shield to pass through large-diameter sewage main pipe underground

An earth pressure balance shield and construction method technology, which is applied in the fields of earthwork drilling, underground chambers, utilization of re-radiation, etc., can solve the problems of difficult construction, high risk, economic loss, etc., so as to reduce construction difficulty and ensure Safe and control the effect of settlement and deformation

Inactive Publication Date: 2020-09-25
郑州地铁集团有限公司
View PDF7 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Based on the above problems, the object of the present invention is to provide a construction method for the earth pressure balance shield to pass through the large-diameter sewage main pipe, which is used to solve the difficulty and risk of construction when the shield tunnel passes through the large-diameter sewage main pipe in the prior art. High, improper control can easily cause heavy casualties and economic losses

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for earth pressure balance shield to pass through large-diameter sewage main pipe underground
  • Construction method for earth pressure balance shield to pass through large-diameter sewage main pipe underground
  • Construction method for earth pressure balance shield to pass through large-diameter sewage main pipe underground

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0034] Such as figure 1 As shown, the construction method of earth pressure balance shield tunneling through large-diameter sewage main pipes. Before construction, a detailed investigation of the sewage pipes within the scope of influence of the shield construction is carried out, mainly including the completion data of the sewage pipes, the design data of the interval tunnel and the surrounding areas of the site. environment, in order to grasp the construction risk of the shield passing through the sewage pipe; considering that the settlement of the sewage pipe caused by construction is closely related to the stratum, the stratum-structure model is used for deformation analysis to simulate the stress and deformation of the sewage pipe, and theoretically determine the shield. The safety of tunneling through the sewage pipe of the structure; set up a 60m experimental section before the tunneling, comprehensive statistical analysis of earth pressure, speed, thrust, torque, grouti...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of shield construction, in particular to a construction method for an earth pressure balance shield to pass through a large-diameter sewage main pipe underground, and is used for solving the problems of high construction difficulty, high risk and great casualties and economic loss easily caused by improper control when the shield passes through the large-diameter sewage main pipe underground in the prior art. The construction method comprises the following steps that 1, engineering investigation is carried out, an underwater color television and a geological radar are adopted; 2, the mutual influence of a tunnel and a sewage pipe is predicted, deformation analysis is carried out by adopting a stratum I structure model; 3, construction preparation before underneath pass is carried out, comprehensive statistical analysis is carried out by adopting a 60m experimental section; and 4, shield underneath pass tunneling is carried out, and stratum settlement is controlled through a clay shock method. According to the construction method for the earth pressure balance shield to pass through the large-diameter sewage main pipe underground, the construction difficulty and the corresponding risk can be effectively reduced through engineering investigation, prediction of the mutual influence of the tunnel and the sewage pipe, construction preparation before underneath pass and shield underneath pass tunneling, and therefore casualties and economic losses can be reduced.

Description

technical field [0001] The invention relates to the technical field of shield construction, in particular to an ignition system for a small turbojet engine with afterburner, and more specifically to a construction method for an earth pressure balance shield passing through a large-diameter sewage main pipe. Background technique [0002] The subway is a fast, large-capacity, electric traction rail transit built in the city. The train runs on a fully enclosed line. The lines located in the central urban area are basically located in underground tunnels, and the lines outside the central urban area are generally located in viaducts. Or on the ground, the subway is an urban rail transit system that covers various underground and above-ground right-of-way exclusive, high-density, and high-capacity urban rail transit systems in urban areas. Tunnels are inevitable in the subway lines. [0003] In the prior art, the shield tunneling method is usually used in the construction of subw...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/06E21F17/18E21D11/08E21D11/10G01S13/88G01S13/89
CPCE21D9/003E21D9/06E21D11/08E21D11/10E21F17/18G01S13/885G01S13/89
Inventor 张伟明张洲刘阳君王宇霁丁卫华张瑞铎郭宏智何振华李研科吴彪刘家军吴小鹏徐延召付新志花付南
Owner 郑州地铁集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products