Artificial water body simulation test device for hydrophobic particles and test method thereof
A simulation test, particle technology, applied in the direction of measuring devices, suspension and porous material analysis, instruments, etc., can solve the problems of no special equipment for anti-seepage performance test of anti-seepage structure, inability to accurately and reasonably guide construction, and lagging results, etc., to achieve It is convenient to measure and observe the water level height, extend the permeable route, and increase the effect of permeable pressure bearing capacity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] A test method for an artificial water body simulation test device for hydrophobic particles, the method comprising the following steps:
[0061] Step 1. Side wall sealing treatment:
[0062] Clean the inside of the sealing device body 1 to ensure that the inner surface is dry and clean; set the side wall sealing layer 3 to ensure that the side wall sealing layer 3 is closely bonded to the side wall and the bottom wall of the sealing device body 1. After curing, proceed to step 2.
[0063] Step 2. Laying the bottom anti-seepage structure:
[0064] Set the lower isolation net 41 in the raised part 17 of the innermost ring, so as to ensure that the upper part of the water leakage port 16 is covered by the lower isolation net 41;
[0065] Lay hydrophobic particles 5 , upper isolation net 42 covering layer 6 , and surface layer 7 in the sealing device body 1 from bottom to top, and scrape them off sequentially after reaching the set thickness during the laying process.
...
Embodiment 2
[0075] A test method for an artificial water body simulation test device for hydrophobic particles, the method comprising the following steps:
[0076] Step 1. Side wall sealing treatment:
[0077] Clean the inside of the sealing device body 1 to ensure that the inner surface is dry and clean; set the side wall sealing layer 3 to ensure that the side wall sealing layer 3 is closely bonded to the side wall and the bottom wall of the sealing device body 1. After curing, proceed to step 2.
[0078] Step 2. Laying the bottom anti-seepage structure:
[0079] Set the lower isolation net 41 in the raised part 17 of the innermost ring, so as to ensure that the upper part of the water leakage port 16 is covered by the lower isolation net 41;
[0080] Lay hydrophobic particles 5 , upper isolation net 42 covering layer 6 , and surface layer 7 in the sealing device body 1 from bottom to top, and scrape them off sequentially after reaching the set thickness during the laying process.
...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com