Bridge train load action time history extraction method and device and terminal equipment
An extraction method and technology for trains, which are applied in the fields of instruments, character and pattern recognition, computer parts, etc., can solve the problem of high extraction cost, achieve the effect of good robustness, high accuracy, and reduce labor and material costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0030] Please refer to figure 1 , figure 1 A schematic flow chart of a method for extracting time history of bridge train load action provided by an embodiment of the present invention, the method includes:
[0031] S101: Acquire first image data corresponding to a first target and second image data corresponding to a second target.
[0032] In this embodiment, before extracting the time history of bridge train load action, the red square target logo can be set first, such as Figure 4 , Figure 5 As shown, the logo consists of two parts, the central area is a ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


