Calculation method, system and application of standard man-hours for map sheet land type processing in aerial survey office
A technology of standard man-hours and calculation methods, applied in data processing applications, calculations, instruments, etc., can solve problems such as small number of maps, inability to meet operating conditions and efficiency, and inability to fully represent the overall processing difficulty, etc. Working hours accurate effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] The invention discloses a method for calculating standard man-hours for processing map sheets and ground types in aerial surveys. figure 1 shown, including:
[0046] S1. Construct a sample set, the sample set includes S sample maps, and each sample map has at least two types of land; count the processing man-hours T of each sample map s (units are minutes or hours, in this example, hours) and the area of each land type in the sample map sheet (units are square meters or square kilometers, in this example, square kilometers); the s-th sample map The area of the c-th land type in the picture is a sc ;s=1,2,…,S, c=1,2,…,C; C is the total number of land types, S>C;
[0047] When processing a frame with multiple operations, there are two situations:
[0048] Situation 1. J is the total number of processes, t sj is the working hours of process j in the s-th sample frame, j=1,2,...,J, that is, T s is the total man-hours for processing the s-th sample frame;
[0049...
Embodiment 2
[0079] The present embodiment discloses a method for estimating working hours for processing map frames in an aerial survey, including:
[0080] Use the method as in Example 1 to calculate the standard man-hours for land processing W est ;
[0081] If there is only one map frame to be estimated, count the area of each land type in the map frame to be estimated, and form a C-dimensional row vector A est Substitute into linear model A est W est =T est Medium; T est is a C-dimensional row vector A est with C-dimensional column vector W est The dot product of , is the estimated value of processing man-hours for the image frame to be estimated;
[0082] If there are multiple maps to be estimated, count the area of each land type in the map to be estimated to form a matrix A est Substitute into linear model A est W est =T est Medium; T est Estimated processing time for each frame to be estimated.
[0083] The system that realizes the above-mentioned method for estim...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


