Aerial survey interior work map sheet land class processing standard man-hour calculation method and system and application
A technology of standard man-hours and calculation methods, applied in data processing applications, calculations, instruments, etc., can solve the problems of small number of map sheets, failure to meet operating conditions and operating efficiency, easy to underestimate the standard man-hours of land types, etc., and meet the standards of land types accurate working time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] The invention discloses a method for calculating the standard man-hours for the processing of map sheets in the aerial survey industry, such as figure 1 shown, including:
[0046] S1. Construct a sample set, the sample set includes S sample map frames, each sample map frame has at least two types of land; count the processing man-hours T of each sample map frame s (unit is minute or hour, is hour in the present embodiment) and the area (unit is square meter or square kilometer, is square kilometer in the present embodiment) of every kind of land type in the sample map frame; The sth sample map The area of the cth land type in the panel is a sc ;s=1,2,...,S, c=1,2,...,C; C is the total number of land types, S>C;
[0047] When processing a map frame with multiple processes, there are the following two situations:
[0048] Situation one, J is the total number of processes, t sj is the man-hour of process j in the sth sample frame, j=1,2,...,J, namely T s is the to...
Embodiment 2
[0079] This embodiment discloses a method for estimating man-hours for processing map types in aerial surveys, including:
[0080] Adopt as the method in embodiment 1 to calculate land class to deal with standard man-hour W est ;
[0081] If there is only one map to be estimated, count the area of each land type in the map to be estimated, and form a C-dimensional row vector A est Substitute into linear model A est W est =T est Medium; T est is a C-dimensional row vector A est with a C-dimensional column vector W est The dot product of is the estimated processing man-hour value of the image frame to be estimated;
[0082] If there are multiple maps to be estimated, calculate the area of each land type in the map to be estimated to form a matrix A est Substitute into linear model A est W est =T est Medium; T est Estimated processing time for each image frame to be estimated.
[0083] A system that realizes the man-hour estimation method for the above-mentioned ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


