Unlock instant, AI-driven research and patent intelligence for your innovation.

Method and device for determining temporary traffic safety facility layout scheme in road operation area

A traffic safety and road operation technology, which is applied in the traffic control system of road vehicles, traffic flow detection, traffic control system, etc., can solve the problems of unfavorable vehicle traffic, irrationality, and unoptimistic traffic organization work, so as to improve efficiency and the degree of standardization, to improve the effect of the display effect

Inactive Publication Date: 2021-06-18
RES INST OF HIGHWAY MINIST OF TRANSPORT
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

It can only play the role of reminding passing vehicles. When faced with a large traffic flow, it is easy to cause congestion problems, and the owner cannot fully grasp the traffic conditions of the lane, and cannot play the role of efficient use of the lane. It is not conducive to vehicle traffic and affects people's travel. to experience
Moreover, the traffic organization work in the operation area is not optimistic, and the design of the layout of temporary traffic safety facilities in the operation area is not standardized and unreasonable, causing the road section in the operation area to become a major hidden danger point for traffic safety

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and device for determining temporary traffic safety facility layout scheme in road operation area
  • Method and device for determining temporary traffic safety facility layout scheme in road operation area
  • Method and device for determining temporary traffic safety facility layout scheme in road operation area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, not all of them. the embodiment. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0029] At present, in the process of road or bridge construction, the physical isolation method is mainly used to remind passing vehicles. When the traffic flow is large, traffic congestion is prone to occur, which reduces people's travel experience. Based on this, the embodiment of the present invention provides a method, device and electronic equipment for determining the layout scheme of t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method and device for determining a temporary traffic safety facility layout scheme in a road operation area, and relates to the technical field of road traffic safety management, and the method comprises the steps: obtaining a first road index; obtaining a plurality of alternative road operation area temporary traffic safety facility layout schemes and second road parameters respectively corresponding to the alternative road operation area temporary traffic safety facility layout schemes based on the first road indexes and a user graphical interface of the intelligent terminal; and according to the second road parameter of each alternative road operation area temporary traffic safety facility layout scheme, determining a target road operation area temporary traffic safety facility layout scheme from each alternative road operation area temporary traffic safety facility layout scheme. The working area temporary traffic safety facility layout scheme compilation efficiency and standardization degree can be improved, and meanwhile the working area temporary traffic safety facility layout scheme display effect is improved.

Description

technical field [0001] The invention relates to the technical field of road traffic safety management, in particular to a method and device for determining a layout scheme of temporary traffic safety facilities in a road work area. Background technique [0002] With the development of our country's economy, the demand and traffic volume of road traffic are increasing, and the road diseases are also increasing, which makes the task of road maintenance difficult, and the number of maintenance work areas occupying roads continues to increase; in addition, with the increase of traffic demand With the continuous increase, most of the existing roads can no longer meet the growing demand for travel, and road reconstruction and expansion projects that are open to traffic while construction is becoming more and more common. Under the above-mentioned background, the highway operation area has shown a blowout growth, but during the construction operation, it will affect the normal open...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G08G1/01
CPCG08G1/0108G08G1/0125G08G1/0133G08G1/0137
Inventor 武珂缦周荣贵赵娜乐周建钟连德矫成武郝思源李佳辉
Owner RES INST OF HIGHWAY MINIST OF TRANSPORT