Mine vehicle scheduling method and system
A technology for vehicle scheduling and mining, which is applied in the field of mine vehicle scheduling methods and systems. It can solve the problems of reducing mine excavation and transportation capacity, the minimum saturation method is not flexible enough, and does not consider the impact of equipment queuing, so as to improve mine excavation and transportation. The effect of vehicle scheduling and the effect of realizing the excavation load
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] In order to make the objects, technical solutions, and advantages of the present invention, the technical solutions in the present invention will be described in connection with the drawings of the present invention, and it will be described, and , Not all of the embodiments. Based on the embodiments of the present invention, there are all other embodiments obtained without making creative labor without making creative labor premises.
[0040] Due to the prior art mine vehicle scheduling method, there is no consideration of the estimated queuing impact of equipment, the vehicle scheduling effect is not guaranteed, and the production capacity of mine mining can be reduced. To this end, a mine vehicle scheduling method is provided in an embodiment of the present invention to solve the technical problems in the prior art.
[0041] figure 1 A flow schematic of a mine vehicle scheduling method provided in the embodiment of the present invention, such as figure 1 As shown, the m...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


