Pre-buried anchor rod connecting structure penetrating through pre-built building and construction method thereof
A technology for connecting structures and anchor rods, which is applied in the direction of infrastructure engineering, construction, and infrastructure repair to achieve the effect of saving construction costs, adapting to on-site construction, and facilitating construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] Taking a proposed project as an example, the proposed project includes 1#, 2# commercial buildings, 3#~6# residential buildings and underground garages.
[0037] When supporting the foundation pits of 3#~6# residential buildings and underground garages, the structures of 1# and 2# commercial buildings have been sealed; The elevation is 34.600, CFG pile composite foundation is adopted, and plum-shaped piles are arranged. 3#~6# residential buildings, 6~8 floors above ground, 2 floors underground, raft foundation, using CFG pile composite foundation treatment, the bottom of the cushion layer is -8.750, and the absolute elevation is 29.050. The basement level of the underground garage is 2 floors, the raft foundation, the bottom elevation of the cushion layer is -8.550, and the absolute elevation is 29.250. The southeast and northwest corners are locally darker.
[0038]According to the geotechnical engineering survey report, within the depth of 35m in this survey, the up...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com