Underwater operation lifting platform
A technology of underwater operation and lifting platform, which is applied in the direction of underwater operation equipment, lifting devices, ships, etc., and can solve the problems of inability to meet the requirements of safe operation in harsh underwater environments, poor coordination and stability, and small loads , to achieve the effect of improving the flexibility of use, a wide range of use, and improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Embodiment 1: Use only the first lifting plate 6 for underwater operations, control the first push plate 107 to retract the first insertion bolt 106, so that the first lifting plate 6 and the main deck 1 are disconnected from the rigid connection, and then the second sea valve 602 Partially open, so that the external water flows into the two ballast tanks 601, at the same time, the two slewing cranes 4 corresponding to the first lifting plate 6 of this operation slowly release the sling 407, and cooperate with the first lifting plate 6 to sink , by controlling the water intake of the two ballast tanks 601 and the length of the sling 407 of the slewing crane 4 to adjust the hovering depth of the first lifting plate 6 in the water, so as to realize the flexible control of the depth of the first lifting plate 6, when the first After the lifting plate 6 completes the work in the water, the second compressed air storage tank 605 feeds compressed air into the ballast tank 601,...
Embodiment 2
[0042] Embodiment 2: Use two first lifting plates 6 to carry out underwater operations at the same time, the first docking blocks 611 of the two first lifting plates 6 are released from the first docking groove 101 in the main deck 1, and the two first lifting plates 6 The plate 6 is disconnected from the main deck 1, and then the ballast tanks 601 of the two first lifting plates 6 enter water through the second sea valve 602 to drive the first lifting plate 6 to sink slowly, and at the same time, the slewing crane 4 releases the sling 407 to cooperate The first lifting plate 6 sinks, and the two first lifting plates 6 can sink to the same water depth or sink to different water depths for simultaneous operation, and the electric propeller 609 that is arranged at the bottom of the first lifting plate 6 during underwater operations After work, the posture and position in the water of the first lifting plate 6 can be properly adjusted. After the operation is completed, the two fir...
Embodiment 3
[0043] Embodiment 3: Only use the second lifting plate 6 to carry out underwater work, control the second hydraulic push rod 112 to retract the second insertion bolt 110, so that the first lifting plate 7 is released from the rigid connection with the main deck 1, and the first lifting plate 7 and the main deck 1 are released from the rigid connection. The two slewing cranes 4 corresponding to the second lifting plate 7 slowly release the sling 407, cooperate with the second lifting plate 7 to sink, and adjust the hovering of the second lifting plate 7 in the water by controlling the length of the sling 407 of the slewing crane 4 Depth, in order to realize the flexible control of the depth of the second lifting plate 7, when the second lifting plate 7 completes the underwater operation, the two slewing cranes 4 recover the sling 407, the second lifting plate 7 slowly rises to the water surface, and then the second lifting plate The plate 7 inserts the second docking block 705 i...