Unlock instant, AI-driven research and patent intelligence for your innovation.

A pre-service scheduling method for power grid monitoring system based on load balancing distribution

A power grid monitoring and load balancing technology, applied in the transmission system, system integration technology, information technology support system, etc., can solve problems such as disordered data, low power data transmission efficiency, and data transmission interruption

Active Publication Date: 2022-07-22
GUANGZHOU KETENG INFORMATION TECH
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, in the current power data transmission method, when data transmission and channel allocation between multiple remote terminal units and multiple servers are required at the same time, random allocation or manual allocation is often used, because random allocation or manual allocation is still There are repeated allocations or allocation errors and omissions, which are prone to data transmission interruption, confusion, or data loss. It is necessary to repeatedly check the channel allocation and modify it in time. The power data cannot be transmitted on time, which leads to the problem of low power data transmission efficiency.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A pre-service scheduling method for power grid monitoring system based on load balancing distribution
  • A pre-service scheduling method for power grid monitoring system based on load balancing distribution
  • A pre-service scheduling method for power grid monitoring system based on load balancing distribution

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0063] In order to make the purpose, technical solutions and advantages of the present application more clearly understood, the present application will be described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application.

[0064] The pre-service scheduling method for a power grid monitoring system based on load balancing allocation provided by this application can be applied to such as figure 1 in the application environment shown. in, figure 1 The illustrated application environment includes a scheduling unit 102, multiple server instances 104 and multiple remote terminal units 106, wherein the scheduling unit 102 and the server instance 104 and the remote terminal unit 106 and the server instance 104 communicate through a network. The scheduling unit 102 generates a corresponding ser...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present application relates to a pre-service scheduling of a power grid monitoring system based on load balancing distribution. The method includes: sorting a plurality of server instances, generating a corresponding server instance sequence, and acquiring a first quantity corresponding to the server instance sequence and a first terminal number of a current remote terminal unit of a channel to be allocated. According to the first quantity and the first terminal number, the first target server instance is determined from the server instance sequence, and the main channel is established between the first target server instance and the current remote terminal unit. A server instance other than the first target server instance is selected from the server instance sequence as the second target server instance, and a backup channel is established between the second target server instance and the current remote terminal unit. By adopting the method, manual channel allocation is not required, the problem of repeated channel allocation caused by allocation errors and omissions is avoided, the required power data can be transmitted on time, and the power data transmission efficiency is improved.

Description

technical field [0001] The present application relates to the technical field of digital power grids, and in particular, to a pre-service scheduling method for a power grid monitoring system based on load balancing distribution. Background technique [0002] With the development of digital power grid technology and the gradual construction of smart grid, the requirements for power data transmission in digital power grid are increasing. The way the terminal unit (RTU, Remote Terminal Unit) transmits power data to the server. [0003] In the traditional power data transmission mode, the same power data can be transmitted respectively according to the main channel and the standby channel configured by the remote terminal unit. In order to avoid the loss of power data, the transmission of the same power data can be realized by using the main channel and the standby channel to connect to different servers respectively. That is, when the transmission of the main channel fails, th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04L67/1001H04L67/141G06Q50/06
CPCH04L67/141G06Q50/06H04L67/1001Y02E40/70
Inventor 谢型浪何超林张伟谢虎徐长飞杨占杰
Owner GUANGZHOU KETENG INFORMATION TECH
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More