Waterproof and anti-sedimentation prefabricated inspection well chamber foundation structure and construction method
An anti-subsidence and inspection well technology, which is applied in infrastructure engineering, underwater structures, water conservancy projects, etc., can solve problems such as uneven settlement of the foundation of the well chamber, insufficient compaction of the backfill of the foundation pit of the inspection well, etc., and achieve saving The effect of large investment, high practical value and safe construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Such as figure 1 with 2 As shown, a waterproof and anti-settlement prefabricated inspection well chamber foundation structure includes a plain soil rammed layer 2, which is arranged at the bottom of the foundation pit 1; a water retaining wall 3, the water retaining wall 3 is arranged on the inner surface of the bottom of the foundation pit 1, and the plain soil tamping layer 2 is laid on the area surrounded by the water retaining wall 3, and a waterproof board 31 is axially arranged on the top of the water retaining wall 3, and the Part of the waterproof board 31 is left in the waterproof wall 3; the graded crushed stone cushion 4 is arranged on the upper surface of the plain soil compacted layer 2, and the top of the graded crushed stone cushion 4 flush with the top of the water retaining wall 3; the well chamber cushion 5, the well chamber cushion 5 is arranged on the top of the area surrounded by the water retaining wall 3, covering the graded crushed stone cushion...
Embodiment 2
[0046] A waterproof and anti-settling prefabricated inspection well chamber foundation structure and construction method, which are basically the same as in Example 1, the difference is that the compaction coefficient of the plain soil rammed layer reaches 0.97, the compacted thickness is 1m, and the retaining wall The enclosed area has a square cross section.
Embodiment 3
[0048] A waterproof and anti-settling prefabricated inspection well chamber foundation structure and construction method, which are basically the same as in Example 1, the difference is that the compaction coefficient of the plain soil rammed layer reaches 0.95, the compacted thickness is 1.5m, and the water retaining The area enclosed by the wall has a circular cross-section.
[0049]To sum up, on the one hand, the present application provides a waterproof and anti-settling prefabricated inspection well chamber foundation structure, including plain soil compacted layer, water retaining wall, graded crushed stone cushion and well chamber cushion. Compared with the traditional well foundation cushion, the water retaining wall can effectively support the well foundation; the water retaining wall and the water retaining plate can effectively block the infiltration of groundwater; the graded crushed stone cushion can A small amount of water is absorbed, infiltrated and slow-releas...
PUM
Property | Measurement | Unit |
---|---|---|
Thickness | aaaaa | aaaaa |
Particle size | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com