Method for monitoring collaborative execution condition of investment plan and fund plan of power grid infrastructure project
A technology for investment planning and infrastructure construction, applied in finance, forecasting, computing, etc., can solve the problems that data is difficult to effectively link and balance each other, and cannot cooperate with each other
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not limit the present invention.
[0043] Such as figure 1 As shown, the present invention provides a method for monitoring the coordinated execution of the grid infrastructure project investment plan and capital plan, which is characterized in that it includes the following steps:
[0044] S1. According to the engineering data of the power grid infrastructure project, the construction period of the power grid infrastructure project, the corresponding construction period plan schedule nodes and the relative completion time of each construction period schedule node are obtained, and a milestone schedule plan is generated; the milestone schedule plan is used to represent monthly settings progress of the project;
[0045] S2. Calculate the cost generated by each cons...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com