Large-span large-cantilever roofing cable-stayed type double-layer prestressed steel grid roof structure
A technology of prestressed steel and prestressed steel cables, which is applied to truss structures, girders, roofs, etc., can solve the problems of large steel consumption, long diagonal web rod length, and increased steel consumption, so as to reduce steel consumption Quantity, reduce project cost, improve the effect of overall rigidity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0014] Embodiments of the present invention: as attached figure 1 As shown, it includes a double-layer flat steel grid frame 1 composed of quadrangular pyramids connected upright. A support frame 2 is provided on the supporting upper chord node of the steel grid frame 1. The height of the support frame 2 needs to be determined according to the height of the steel grid frame 1. The size of the cable prestress is determined after calculation; a fixed pulley 3 is arranged on the top of the support frame 2, and four force transmission devices 5 are arranged orthogonally on the lower chord node in the middle of the steel grid frame 1, and each force transmission device 5 consists of a steel box 6, a fixed pulley 7 installed in the steel box 6, and a tie rod 8 fixed at the bottom of the steel box 6. Figure 4 shown). Two prestressed steel cables 4 are arranged orthogonally in the steel grid frame 1. The distance between the two prestressed steel cables 4 perpendicular to the span d...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 