Mounting method of large pressure machine prestressed draw-bar
A technology of prestressed tie rods and installation methods, which is applied to presses, manufacturing tools, etc., can solve problems such as inability to install, limited lifting space, and large volume, and achieve the effects of saving installation costs and controlling prestress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] Please refer to Fig. 1-Fig. 3, prefabricated 4 foundation process pits (11) in the large-scale press concrete foundation; Pull bar (1) is placed between two skids (5), (6) earlier, draw bar Place the counterweight (7) at one end of (1), install the suspension shaft (4) on the upper end of the square column (2), hoist the square column (2) horizontally, hang the middle and lower section of the tie rod (1), and adjust the counterweight After the pull rod (1) is balanced, the square column (2) is inserted into the pull rod (1), the upper nut (3) is screwed on the upper end of the pull rod (1), and the pull rod ring (20) is connected to the top of the pull rod (1). Install the base (10) on the concrete foundation of the press, lift the installed square column (2) together with the pull rod (1), put the pull rod (1) vertically into the mounting hole of the base (10), and place it on the base (10) exposed under the installation hole, screw in the lower nut (19) at the bottom ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 