Water-retaining cofferdam mode used in case of difficult implementation of heavy excavation method
A cofferdam, the largest technology, applied in the field of water-retaining cofferdam types, can solve problems such as difficulties in excavating concrete longitudinal cofferdam foundations, hidden dangers of project power generation on time, failure to meet project progress requirements, etc., to meet construction progress requirements, Improve the ability of shear transmission and ensure the effect of safety and stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Benefits of technology
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The scale of a large-scale hydropower station project is huge, the engineering geological conditions of the dam site are complex, and the river valley is relatively narrow. Stage diversion is adopted and the diversion flow is large. Add any supporting measures, and directly excavate the cover layer of the second-stage longitudinal weir under the protection of the first-stage earth-rock cofferdam (that is, the large-scale excavation method). The horizontal width of the side slope of the first-stage foundation pit is about 90m-120m, and it has completely occupied the position of the second-stage vertical weir on the plane, and it exceeds the right line of the front of the diversion bottom hole used for the second-stage discharge (see figure 1 ), therefore, support measures must be taken in order to achieve the purpose of excavating all the foundation covering layer of the second-stage vertical weir in the first-stage foundation pit and then pouring the weir body concrete. ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 