Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Technical level of application management system

A technology of application management and hierarchy, applied in the field of information systems, can solve problems such as system errors, project budget doubling, long development time, etc.

Inactive Publication Date: 2010-12-01
BEIJING ZHENGCHEN SCI & TECH DEV
View PDF0 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the rapid development of the software industry, some problems and crises are gradually exposed, such as manual workshop software development, project time is always delayed, delivery cannot be guaranteed on schedule, project budget is doubled, and project personnel are constantly flowing, etc. are some of the problems developers face
Customers may face such problems: why the project costs so much, why the development time is so long, whether the main developer can be guaranteed, too many system errors submitted, etc.; therefore, software development is no longer the same as in the past. Things Two Developers Can Solve

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Technical level of application management system
  • Technical level of application management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] Such as figure 1 As shown, the technical level of an application management system is characterized in that it includes:

[0024] Bidding management: enter the content of bidding application and bidding documents offline, and can modify, delete and other operations.

[0025] Project establishment management: enter the content of the project establishment form, project budget form, and project cost accounting form offline, and can perform operations such as modification and deletion.

[0026] Project preparation: enter the content of the project promotion form, project demand form, procurement plan and payment plan offline, and can perform operations such as modification and deletion.

[0027] Project implementation: Offline entry of the project budget sheet finally confirmed by the customer and the company's internal cost accounting sheet, project execution time and on-site execution personnel division of labor.

[0028] Project Reimbursement: Enter the reimbursement ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the information system field, in particular to a technical level of an application management system. The platform mainly tracks a project of a company, and can relate to a plurality of stages (bidding stage, project approval stage, preparation stage, implementation stage, project settlement and the like) and a plurality of roles (project member, project manager, chief financial officer, president and the like). In order to connect the stages and the roles in series in the whole process of one project, an intelligent workflow is built for supporting application and approval of each stage of the project, automatically performing service flow, performing authority control on the project operation under each stage and meanwhile searching the current stage of the project at any time.

Description

technical field [0001] The invention relates to the field of information systems, especially the technical level of the application management system. Background technique [0002] With the rapid development of the software industry, some problems and crises are gradually exposed, such as manual workshop software development, project time is always delayed, delivery cannot be guaranteed on schedule, project budget is doubled, and project personnel are constantly flowing, etc. are some of the problems developers face. Customers may face such problems: why the project costs so much, why the development time is so long, whether the main developer can be guaranteed, too many system errors submitted, etc.; therefore, software development is no longer the same as in the past. Something that two developers can solve. Adequate and appropriate planning and control mechanisms are particularly important. Therefore, an effective management tool is urgently needed to help the project ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/00G06Q50/00
Inventor 卢明
Owner BEIJING ZHENGCHEN SCI & TECH DEV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products