Protective method of pipelines in natural gas pipeline full-section excavation construction
A natural gas pipeline, full-section technology, used in excavation, infrastructure engineering, construction, etc., to solve the problem that the pipeline cannot be moved casually.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.
[0043] see figure 1 , the invention provides a kind of natural gas pipeline full-section excavation construction to pipeline protection method, comprises the following steps:
[0044] (1) Make bored cast-in-place piles on both sides of the natural gas pipeline according to the SWM construction method. The bored cast-in-situ piles are arranged on both sides outside the foundation pit enclosure structure, and the diameter of the bored cast-in-place piles is 800mm.
[0045] (2) Make concrete caps on bored piles. The width of the concrete cap is 1200mm, the height is 1000mm, and the distance between the bottom surface of the concrete cap and the top of the natural gas pipe is 500mm.
[0046] (3) Set up the Belle frame on the concrete cap. The Belle rack is a four-row structure Belle rack.
[0047] (4) Use wooden squares and thick steel plates to form...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com